Blind River, Ontario, Canada
After a number of uranium mine
closures in nearby
Elliot Lake in the early 90s, economic
adjustment funds provided by the provincial government helped create the
Elliot Lake and Area Energy Efficiency Program. Funds from this program
were used to install an AOC 15/50 wind turbine. In the spring of 1998,
construction of the wind turbine was completed. Since it began
operating, the turbine has provided about half of the power needs of the
town's marina. |
|
|
|
|
Carmicheal Estates, Scotland
Here are some photos of the AOC 15/50 that was installed at the
Carmichael Estate in Scotland in July 1998. The wind turbine is
offsetting power costs at the Carmichael Visitor Centre. |
|
|
|
|
Cassop Primary School, England
The Cassop primary school wind turbine
offsets power costs and serves as an educational tool.
The school has
won the coveted Kuoni Award for their
environmental teaching & awareness. The wind turbine was officially
opened by British Prime Minister - Tony Blair - whose parliamentary
constituency is next door to Cassop. |
|
|
|
|
Eskasoni First Nations, Nova
Scotia, Canada
Installed in the summer of 2004, the Eskasoni
wind turbine offsets power costs at the band council office. It is the
first net-metered wind turbine installation of its size in Nova Scotia. |
|
|
|
|
Island of Luing, Scotland
The remote location of these two turbines on the western Scottish Isle
of Luing made installation challenging but
worth the effort.
The turbines have produced over 500,000kwh’s of electricity since their
installation. Turbine one was installed in 2002 and the second
was added in 2004. |
|
|
|
|
Kilrea, Northern Ireland
This turbine is offsetting the high power costs from running an
engineering machining facility. Installed in 2003. |
|
|
|
|
Kotzebue, Alaska, US
The largest AOC 15/50
wind farm in the world, Kotzebue has 10 wind
turbines offsetting the cost of expensive diesel fuel. |
|
|
|
|
New York,
NY, US |
|
|
|
|
Oreland, Maine - Blueberry
Farm
The
Orland, Maine Turbine was installed by Endless Energy in December of
2000. Currently, it is the largest operating turbine in Maine and the
only turbine in the state that sells green tags. |
|
|
|
|
Rankin Inlet, Nunavut, Canada
Installed in 2000, this turbine produces power to offset high diesel fuel
costs for electricity generation in Rankin Inlet.
|
|
|
|
Sachs Harbour, Northwest Territories, Canada
Installed in 1999 |
|
|
|
|
Sagar Island, India
These are the first two
of ten wind turbines installed on Sagar
Island off the west coast of India. A remote location, installation was
challenging as no heavy machinery was available. The wind turbines will
work as part of a high penetration no storage wind/diesel hybrid system
which will allow more villages on the island to have access to
electricity and improve the quality of life of the villagers. |
|
|
|